Equipement

Actualités

06.07.2018

We would like to answer the questions, concerning pyrolysis equipment “living” after continuous exploitation, and inform you, that in the section “Equipment Photos” the pictures of “Pirotex” pyrolysis plant from Nizhniy Novgorod, sold in 2011 and 2014, are available to see.

Détails
29.12.2017

Dispatch of the gas-vapor activating furnace “KVARK-500” took place on 27 December, 2017 to the customers from Kyrgyzstan. This equipment is used due to the project for obtaining of activated carbon from shell of all types of nuts, fruit trees pits and other types of feedstock.

Détails
29.12.2017

The experiment on apricot pits activation in gas-vapor activating furnace “KVARK-500” was performed at “Jelezno” plant.

Détails
14.11.2017

Part “video” of “Pirotex” pyrolysis plant was replenished with new video about the exploitation of 42-tons plant, which processes large-sized, middle-sized and small-sized waste tires. This equipment is complemented with two carbon processing lines “Konstanta”.

Détails
15.10.2017

As being small enterprise support, manufacturing plant “Jelezno” announces the release of gas-generators “UGLAS-800” lot at special price of 46 283 Euro. This lot consists of five gas-generators in the simplest complement, which have standard capacity from 3,5 (forcing underrating) up to 7,5 tons of feedstock per day.

Détails
18.09.2017

Technokomplex company informs, that pyrolysis plant “Pirotex” from the manufacturer Group of companies “JELEZNO” has gained European certification CE

Détails
08.02.2017

Pirotex pyrolysis plant (up to 7 tons capacity of feedstock per day) was supplied to Czech Republic in the beginning of February, 2017. The designed purpose of the equipment - plastic's utilization.

Détails
06.02.2017

On January 2017 the final assembling of Pirotex pyrolysis plant with the capacity 2 tons of feedstock per day on source feedstock is finished in Stavropol territory, Caucasian Spas.

Détails
18.11.2016

In October, 2016 there was an installation and activation of Gas Generator “UGLAS-800” in Estonia. The aim of this project is to generate electric energy from sawdust and wood chips. Accordingly, the complement includes not only Gas Generator, but also Gas-powered electrical generator. In this case the capacity of Gas-powered electrical generator was 200 kW.

Détails
30.09.2016

Technokomplex company informs on the installation completion of the smallest in Pirotex line pyrolysis plant (2.5 tons) in Business set. Installation took place in Leningrad region.

Détails